Chatham Pool Renovation Project

Construction has started on the Chatham Street Pool Renovation Project.

Project: Unusual movement and sinking of the pool decking was causing significant cracking and sinking of the concrete pool decking.  This project, which is led by GMB Architects and Engineers, will result in the full resurfacing of the current concrete pool decking. 

The decking will be replaced with pavers.  Pavers will provide a more decorative look, while allowing easy access to pool components for future needed repairs.  This greatly extends the life of the pool decking as concrete sections will no longer need cut when pool repairs are needed. 

The edge of the pool will be surrounded with pool coping to provide a clean pool edge.  Pool coping is installed in small sections, which will also allow easy removal for any necessary future repairs.

The kiddie pool will be replaced and upgraded with a small water feature and the main pool will be resurfaced as part of this project. 

Progress photos of the project will be posted on this webpage.  Visit often to stay updated on the progress. 

Note: At times, a portion of Dorsey Street will be closed to accommodate work equipment. This was previously noted as Chatham Street.

Photos below show an example of the paver selection and kiddie pool water feature (only 1).  These are examples only and final installation may vary. 



  

Progress Photos

Week 1: January 3, 2024

     

  

  

  

  

  

Week 2: January 8, 2024

  

  

  

  



Week 3: January 15, 2024

  

  

  

Week 4: January 21, 2024

   
 
   
 
Week 5: January 28, 2024

   

     

  

Week 6 - February 4, 2024

    

    

  

Week 7 - February 11, 2024

    

  

Week 8 - February 18, 2024
New Kiddie Pool is Poured

   

   

Week 9 - February 25, 2024